When can an acceptable level of competence determination be delayed?
An acceptable level of competence determination can be delayed for only two reasons:
when an employee has not had the minimum period of time to demonstrate acceptable performance on his or her elements and standards; and
when an employee is reduced in grade because of unacceptable performance to a position in which he or she is eligible for a within-grade increase or will become eligible within the minimum appraisal period.